Harmonized System:8474209000
EPS-1/8 crushing and cutting joint prototype is a scientific and technological product developed by our factory in recent years. The machine overcomes the defects of the original product, such as easy to stick, easy to block and low crushing force, making it more perfect, more reliable and more truly representative.
The new EPS-1/8 crushing and cutting joint prototype is made according to the international standard (ISO1988-1975 ; GB/T 474-1996 ) research and development, all indicators are up to international and national standards. It has the function of one level shrinkage for materials below medium hardness. It is widely used in electric power, coal, metallurgy, geology, building materials, chemical industry and other industries.
This equipment is mainly used for coal and other raw materials, the preparation of the sample blocks for crushing and screening and complete classified three working system, especially suitable for large laboratory use. Technical Parameter:
Equipment Structure and Working Principle
EPS-1/8 fully sealed jaw crushing and shrinking machine is composed of motor, jaw crushing assembly, shrinking subsystem, hopper and transmission mechanism.
Precautions for device installation
When the equipment arrives at the designated place as required by the user, it should be unpacked and inspected in time to eliminate possible parts looseness during transportation, read the operation manual, and install, use, maintain and maintain the equipment in strict accordance with the requirements in the operation manual.
1. the equipment must be installed on the level of concrete, and between the foundation and the equipment base pad with hard hibiscus or other cushioning materials, in order to reduce vibration and noise.
2. the equipment uses 380V power supply, installation and use must be safe grounding.
3.The rotation direction of the motor must be consistent with the rotation direction on the equipment mark.
Equipment Use and Maintenance:
Tips before enabling:
1. Check whether the transmission parts of the equipment are flexible and all fasteners are securely fastened. 2. Whether the driving belt is intact. 3, the protective device should be intact, found unsafe hidden danger should be dealt with immediately. 4. Before starting the equipment, check whether there are materials or sundries in the crushing chamber. If sundries are found in the chamber, they should be cleaned up. 5. The machine is only allowed to start under no load. 6. Equipment operation (sample preparation) procedure. No-load starting equipment - after smooth operation - feeding crushing - crushing end, after three minutes machine halt - take out hopper, hopper - sampling, abandoned material return.
Equipment usage instructions:
1. the machine is started and stable, can be in accordance with the technical parameters (feed maximum particle: ≤100mm) requirements. 2. the normal working state of the equipment bearing temperature should not exceed 40℃, the highest temperature should not exceed 70℃, the temperature is too high should immediately stop the inspection, troubleshooting. 3. Feeding should be stopped before shutdown, and after the material is completely eliminated from the crushing chamber and running for 3 minutes, the machine can be shut down. 4. When the equipment is abnormal or hears abnormal sound during operation, it should be shut down immediately. After finding out the cause, troubleshooting and cleaning up the crushing chamber, it can be started.
Equipment maintenance and maintenance:
1. Check regularly whether the fasteners of all parts of the equipment are loose. (3 months) 2. Check the lubrication status of all transmission parts of the equipment regularly. (per week) 3. Check regularly whether the protective parts of the equipment are in good condition. (3 months) 4. Check regularly whether the electrical appliances and circuits of the equipment are in good condition. (2 months) 5. Check the wear and tear of all vulnerable parts of the equipment regularly. (3 months) 6. regular cleaning of the body inside the deposit. (per week) 7. do a good job of equipment lubrication, it is required to clean the bearing once every three months, and add calcium base, sodium base grease.
Equipment vulnerable parts and name
1. Hammer 2. Ring shaft 3. Bearing (8006309) 4. B triangle belt
Safe operation specification
1. operators must be trained in safety technology, and have a certain sense of safety. 2. When the equipment is in operation, any adjustment, cleaning or overhaul of the equipment is strictly prohibited. 3. When the equipment is running (sample preparation), it is strictly forbidden to open the protective door and peep into the machine, and do not put your hand into the body.
XPZ200 x 75 double rollers crusher
EP series mandibles crusher
Sealed sample testing system GJ series crusher
The SMP - 400 wet coal crushers
PCZ series seal hammer crusher
WZ - 50 type miniature system prototype
Telephone: 0086-392-3313798 fax: 0086-392-2172001
Zip number : 458030
Address: He nan hebi citizens born technology development Co., LTD.